AllWeb.jpg

Equipment

 

MAPXS.jpg

Pneu-MAP

 

VibeExs.jpg

Pneu-Vibe

Vibration Overview Video

 

pbcxs.jpg

Pneu-Back Chair

 

PGfootxs.jpg

Pneu-Gait Foot Strap

 

DPWxs.jpg

Pneu-Weight

 

Vestxs.JPG

Pneu-Vest

 

XSWalker-A.jpg

Pneu-Walker

Walker Video

 

bes.jpg

Band Exercise System

Printable Specifications

       
Manufacturing Process 
 

All Pneumex equipment presently in production and items in development were designed by Gerry Cook, Engineer and owner. Specifications are generated on a computer generated mechanical design program. These drawings are sent to the machine fabricators and the steel is fabricated according to the exact specifications in the drawings. The fabricated steel is quality checked before leaving the machine facility. The fabricated steel is sent to powder coating, where it is sandblasted, then electrolstaticly coated with Titanium Dioxide and Silica, amorphous, then cured at 400º for 20 to 30 minutes.


The machined and coated pieces are assembled at our facility in Sandpoint, Idaho into designated equipment. Each piece of finished equipment is tested before it leaves the assembly area. The finished equipment is cleaned and then transferred to the packing area where the equipment is re-tested,and checked for overall appearance and function; if for any reason the equipment does not perform as intended it is returned to assembly for adjustment.


The tested equipment is broken down into components for shipping. Each component is carefully wrapped and placed in shipping cartons. The carton content is checked against a packing list to assure that each carton contains the correct parts. The outside of the carton has a packing list (with a check off list of each item packed) and the serial number of the equipment inside

   
   

Copyright 1998    Pneumex, Inc.    All Rights Reserved     800.447.5792